2502 Fredrick Douglass Bl
2502 Fredrick Douglass Bl in Central Harlem, Manhattan, has 38 open HPD violations, 9 of them class C, and 9 of 9 units are rent-stabilized, as of Oct 26, 2026. StreetSpy grade: F (40/100).
Mixed residential & commercial · 9 units · Built 1910
StreetSpy grade: F (Severe, 40/100)
- 9 immediately hazardous violations open (the class that covers no heat, pests, lead paint and similar).
- 6 heat or hot water complaints to 311 in the last 12 months.
- The head officer on this registration is named on 4 buildings' registrations; 3 graded D or F.
- 9 of 9 units are rent-stabilized.
More open violations per unit than 8 in 10 Manhattan buildings this size.
- Repairs: High (38 open, 9 class C), records as of Oct 26, 2026
- Heat and hot water: 6 complaints, 12 mo, records as of Oct 25, 2026
- Pests: Clear (Owner reported none, 3 yr), records as of Oct 28, 2026
- Safety: Clear (No open DOB violations), records as of Oct 26, 2026
- Registration: Renewal not yet in city data, records as of Oct 3, 2026
Housing code violations (HPD)
38 open violations: 9 class C (immediately hazardous), 21 class B, 8 class A. 27 issued in the last 12 months. 210 on record. Oldest open violation issued 2021-08-23. Newest violation issued 2026-08-20.
4 closed in the last 90 days. Median 78 days from issue to close for the 10 violations closed in the last 12 months.
- Class C: Mold, ceiling, bathroom, 1st floor. HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 3O SQUARE FEET AT THE CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH (apt 1A), issued 2026-04-24. HPD violation 18810014
- Class C: Damaged plaster or paint, ceiling, 3rd room from the east, 1st floor. REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH (apt 1A), issued 2026-04-24. HPD violation 18810021
- Class C: No heat / heating defect, radiator on the east wall, 1st room from the east, 1st floor. HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HYDRONIC BASEBOARD RADIATOR COVERS AT HYDRONIC BASEBOARD RADIATOR AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH (apt 1A), issued 2026-04-24. HPD violation 18810020
- Class C: Floor or stair defect, 3rd room from the east, 1st floor. PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH (apt 1A), issued 2026-04-24. HPD violation 18810022
- Class C: Damaged plaster or paint, west wall, kitchen, 1st floor. PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SINK BASE CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH (apt 1A), issued 2026-04-24. HPD violation 18810017
- Class C: Floor or stair defect, kitchen, 1st floor. PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH (apt 1A), issued 2026-04-24. HPD violation 18810018
- Class C: Damaged plaster or paint, north wall, bathroom, 1st floor. PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD VANITY CABINET AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH (apt 1A), issued 2026-04-24. HPD violation 18810013
- Class C: Self-closing door not working, 2nd floor. , 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST (apt 2B), issued 2026-04-02. HPD violation 18752421
311 housing complaints
7 in the last 12 months, 38 in 5 years. Most common: Heat/Hot Water (6), Paint/Plaster (1).
Bedbugs
The owner reported 0 infested units in the last 3 years of filings. HPD's bedbug filings are self-reported by the owner once a year; HPD does not inspect to confirm them.
- 2026: No bedbug filing on record for this year
- 2025: No bedbug filing on record for this year
- 2024: Owner reported 0 infested units
- 2023: Owner reported 0 infested units
- 2022: Owner reported 0 infested units
- 2021: Owner reported 0 infested units
Buildings department (DOB)
No open DOB violations. 4 DOB violations on record. Check on DOB BIS.
Evictions and housing court
0 executed evictions in the last 3 years (0 on record). 0 open HPD cases; 0 harassment findings.
Rent stabilization
9 of 9 units rent-stabilized as of 2024. Stabilized renewals: 0% for one year and 0% for two years under RGB Order #58 (Oct 1, 2026 to Sep 30, 2027).
Rent-stabilized units on city tax bills: 9 in 2024, 9 in 2007. Source: DOF tax bills for 2007 and 2024; years with no bill on file are left out.
Owner and management
Owner: AFF-WHGA MN11E LIMITED PARTNERSHIP. Head officer: LENORE B BROWNE. Managing agent: WEST HARLEM GROUP ASSISTANCE, INC.. This owner has 4 buildings on record, 3 graded D or F. See the full portfolio.
Last HPD registration Jul 18, 2025. Registration on file through Sep 1, 2026; renewal not yet in the city's data.
Tax lot and city IDs
BBL 1019390062, HPD building ID 4080. HPD Online, ACRIS, DOB BIS.
Nearest subway
- 135 St (C, B), 3 min walk
- 135 St (2, 3), 7 min walk
- 125 St (A, C, B, D), 8 min walk
How the grade is calculated
| Factor | On record | Points |
|---|---|---|
| Open HPD violations | 38 open (9 class C, 21 class B, 8 class A) | −40 |
| 311 housing complaints (12 mo) | 7 | −20 |
| Bedbug reports (3 yr) | None reported | 0 |
| Executed evictions (3 yr) | None | 0 |
| Housing litigation | No open cases | 0 |
| Open DOB violations | None | 0 |
Sources: NYC HPD Housing Maintenance Code Violations, NYC 311 Service Requests, NYC HPD Bedbug Reporting, NYC Marshal Evictions (DOI), NYC HPD Housing Litigations, NYC DOB Violations, NYC DOF tax bills (via JustFix Who Owns What portfolio API, v2), NYC HPD Property Registration. Methodology. Report generated 2026-10-28.