9022 Krier Place
9022 Krier Place in Canarsie, Brooklyn, has 20 open HPD violations, 12 of them class C, and its rent-stabilization status could not be verified, as of Oct 25, 2026. StreetSpy grade: D (60/100).
One & two family · 2 units · Built 1930
StreetSpy grade: D (Poor, 60/100)
- 12 immediately hazardous violations open (the class that covers no heat, pests, lead paint and similar).
- No housing complaints to 311 in the last 12 months.
- Repairs: High (20 open, 12 class C), records as of Oct 25, 2026
- Heat and hot water: No complaints, 12 mo, records as of Oct 25, 2026
- Pests: Clear (No bedbug filing, 3 yr), records as of Oct 27, 2026
- Safety: Clear (No open DOB violations), records as of Oct 23, 2026
- Registration: Not on file, records as of Oct 28, 2026
Housing code violations (HPD)
20 open violations: 12 class C (immediately hazardous), 5 class B, 2 class A, 1 class I (HPD orders such as lead paint or heat orders, not a hazard class). 12 issued in the last 12 months. 24 on record. Oldest open violation issued 2014-01-09. Newest violation issued 2025-11-28.
0 closed in the last 90 days. Median 48 days from issue to close for the 1 violations closed in the last 12 months.
- Class C: Lead paint hazard, 1st floor. , 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, PRESUMED LEAD PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST (apt 1), issued 2025-11-28. HPD violation 18465493
- Class C: Lead paint hazard, 2nd room from the north, 1st floor. - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST (apt 1), issued 2025-11-26. HPD violation 18465187
- Class C: Lead paint hazard, west wall, bathroom, 1st floor. - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST (apt 1), issued 2025-11-26. HPD violation 18465192
- Class C: Lead paint hazard, 6th room from the north, 1st floor. - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 6th ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST (apt 1), issued 2025-11-26. HPD violation 18465189
- Class C: Lead paint hazard, 1st floor. - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST (apt 1), issued 2025-11-26. HPD violation 18465190
- Class C: Lead paint hazard, kitchen, 1st floor. - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, NORTH WALL IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST (apt 1), issued 2025-11-26. HPD violation 18465191
- Class C: Lead paint hazard, 6th room from the north, 1st floor. - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE 6th ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST (apt 1), issued 2025-11-26. HPD violation 18465188
- Class C: Lead paint hazard, 1st room from the north, 1st floor. - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST (apt 1), issued 2025-11-26. HPD violation 18465186
311 housing complaints
0 in the last 12 months, 3 in 5 years.
Bedbugs
No bedbug filing on record for the last 3 years. HPD's bedbug filings are self-reported by the owner once a year; HPD does not inspect to confirm them.
- 2026: No bedbug filing on record for this year
- 2025: No bedbug filing on record for this year
- 2024: No bedbug filing on record for this year
- 2023: No bedbug filing on record for this year
- 2022: No bedbug filing on record for this year
- 2021: No bedbug filing on record for this year
Buildings department (DOB)
No open DOB violations. 0 DOB violations on record. Check on DOB BIS.
Evictions and housing court
0 executed evictions in the last 3 years (2 on record). 0 open HPD cases; 0 harassment findings.
Rent stabilization
Stabilization status could not be verified.
Owner and management
Owner: 9022 KRIER PL MANAGEMENT CORP. See the full portfolio.
Tax lot and city IDs
BBL 3081240097, HPD building ID 321904. HPD Online, ACRIS, DOB BIS.
Nearest subway
- Canarsie-Rockaway Pkwy (L), 10 min walk
- East 105 St (L), 14 min walk
- New Lots Av (L), 22 min walk
How the grade is calculated
| Factor | On record | Points |
|---|---|---|
| Open HPD violations | 20 open (12 class C, 5 class B, 2 class A, 1 class I) | −40 |
| 311 housing complaints (12 mo) | None | 0 |
| Bedbug reports (3 yr) | None reported | 0 |
| Executed evictions (3 yr) | None | 0 |
| Housing litigation | No open cases | 0 |
| Open DOB violations | None | 0 |
Sources: NYC HPD Housing Maintenance Code Violations, NYC 311 Service Requests, NYC HPD Bedbug Reporting, NYC Marshal Evictions (DOI), NYC HPD Housing Litigations, NYC DOB Violations, NYC DOF tax bills (via JustFix Who Owns What portfolio API, v2), NYC Dept. of City Planning PLUTO (tax-roll owner). Methodology. Report generated 2026-10-28.