70-28 65th Place
70-28 65th Place in Glendale, Queens, has 14 open HPD violations, 1 of them class C, and 6 of 6 units are rent-stabilized, as of Oct 25, 2026. StreetSpy grade: F (46/100).
Multi-family walk-up · 6 units · Built 1931
StreetSpy grade: F (Severe, 46/100)
- 1 immediately hazardous violation open (the class that covers no heat, pests, lead paint and similar).
- 1 open violation is classified rent-impairing under NY Multiple Dwelling Law section 302-a.
- The head officer on this registration is named on 9 buildings' registrations; 7 graded D or F.
- 6 of 6 units are rent-stabilized.
More open violations per unit than 8 in 10 Queens buildings this size.
- Repairs: High (14 open, 1 class C), records as of Oct 25, 2026
- Heat and hot water: No complaints, 12 mo, records as of Oct 25, 2026
- Pests: Clear (Owner reported none, 3 yr), records as of Oct 27, 2026
- Safety: Clear (No open DOB violations), records as of Oct 23, 2026
- Registration: Renewal not yet in city data, records as of Oct 3, 2026
Housing code violations (HPD)
14 open violations: 1 class C (immediately hazardous), 4 class B, 9 class A. 1 issued in the last 12 months. 22 on record. Oldest open violation issued 2022-02-22. Newest violation issued 2026-05-06.
0 closed in the last 90 days. Median 68 days from issue to close for the 1 violations closed in the last 12 months.
1 open violation is classified rent-impairing under NY Multiple Dwelling Law section 302-a. Section 302-a; NY Courts guidance on getting repairs.
- Class C: Self-closing door not working, 1st room from the north, 3rd floor. , 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE SECONDARY ENTRANCE DOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST (apt 3L), issued 2022-02-22. HPD violation 14835317
- Class B: Floor or stair defect, bathroom, 3rd floor. PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST (apt 3L), issued 2022-02-22. HPD violation 14835324
- Class B: Door, lock or intercom defect, 1st room from the north, 3rd floor. & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FURNITURE BLOCKING SECONDAY ENTRANCE DOOR LEADING TO PUBLIC HALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST (apt 3L), issued 2022-02-22. HPD violation 14835318
- Class B: Door, lock or intercom defect, bathroom, 3rd floor. PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR AND FRAME IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST (apt 3L), issued 2022-02-22. HPD violation 14835326
- Class B: Leak or water damage, bathroom, 3rd floor. REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST (apt 3L), issued 2022-02-22. HPD violation 14835315
- Class A: Damaged plaster or paint, bathroom, 3rd floor. M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED ACOUSTICAL DROP CEILING IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST (apt 3L), issued 2022-02-22. HPD violation 14835322
- Class A: Damaged plaster or paint, bathroom, 3rd floor. PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE TILE GROUT AT ALL WALLS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST (apt 3L), issued 2022-02-22. HPD violation 14835323
- Class A: Damaged plaster or paint, bathroom, 3rd floor. PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST (apt 3L), issued 2022-02-22. HPD violation 14835325
311 housing complaints
2 in the last 12 months, 10 in 5 years. Most common: Door/Window (1), Water Leak (1).
Bedbugs
The owner reported 0 infested units in the last 3 years of filings. HPD's bedbug filings are self-reported by the owner once a year; HPD does not inspect to confirm them.
- 2026: No bedbug filing on record for this year
- 2025: Owner reported 0 infested units
- 2024: Owner reported 0 infested units
- 2023: Owner reported 0 infested units
- 2022: Owner reported 0 infested units
- 2021: Owner reported 0 infested units
Buildings department (DOB)
No open DOB violations. 0 DOB violations on record. Check on DOB BIS.
Evictions and housing court
0 executed evictions in the last 3 years (0 on record). 0 open HPD cases; 0 harassment findings.
Rent stabilization
6 of 6 units rent-stabilized as of 2024. Stabilized renewals: 0% for one year and 0% for two years under RGB Order #58 (Oct 1, 2026 to Sep 30, 2027).
Rent-stabilized units on city tax bills: 6 in 2024, 6 in 2007. Source: DOF tax bills for 2007 and 2024; years with no bill on file are left out.
Owner and management
Owner: 70-28 65TH PLACE ASSOCIATES LLC. Head officer: MARIA LAMANNO. Managing agent: GMC PROPERTY MANAGEMENT LLC. This owner has 9 buildings on record, 7 graded D or F. See the full portfolio.
Last HPD registration Sep 9, 2025. Registration on file through Sep 1, 2026; renewal not yet in the city's data.
Tax lot and city IDs
BBL 4036440018, HPD building ID 457409. HPD Online, ACRIS, DOB BIS.
Nearest subway
- Fresh Pond Rd (M), 7 min walk
- Middle Village-Metropolitan Av (M), 11 min walk
- Forest Av (M), 13 min walk
How the grade is calculated
| Factor | On record | Points |
|---|---|---|
| Open HPD violations | 14 open (1 class C, 4 class B, 9 class A). 1 rent-impairing | −40 |
| 311 housing complaints (12 mo) | 2 | −14 |
| Bedbug reports (3 yr) | None reported | 0 |
| Executed evictions (3 yr) | None | 0 |
| Housing litigation | No open cases | 0 |
| Open DOB violations | None | 0 |
Sources: NYC HPD Housing Maintenance Code Violations, NYC 311 Service Requests, NYC HPD Bedbug Reporting, NYC Marshal Evictions (DOI), NYC HPD Housing Litigations, NYC DOB Violations, NYC DOF tax bills (via JustFix Who Owns What portfolio API, v2), NYC HPD Property Registration. Methodology. Report generated 2026-10-28.